6
FCC allocates 5.9 GHz spectrum for DSRC
VII Architecture developed based on Day 1 Use Cases
Prototypes for V2V (safety applications) and V2I (public applications) developed based on DSRC 5.9 GHz and tested in a POC test bed
New assumptions, new initiatives, new timelines
SE Program initiated to re-baseline
Stakeholder workshops to solicit user needs
Re-baselined Core System Concept of Operations, Requirements, & Architecture completed
We are here
2004
2010
2005
2009
2008
.  .  . 
2006
User Needs
System Requirements & Architecture
Aug/Sep 2010
Oct (draft)
Jan (RevA)
Apr (RevB/C)
May (workshop)
June 2011 (Workshop)
Sep (2nd Workshop)
Concept of Operations
5/17/2011