DOT LogoC:\Documents and Settings\newtondia\My Documents\Unzipped\SAIC_Logo_Collection\SAIC_Logo_Collection\JPG\SAIC_logo_RGB-sm.jpgDescription: 3 inch color Bleed.pngnu_logo.gif
INFLO Deployment Vision
15
This slide illustrates the deployment vision for the INFLO applications. The three mobility applications in this bundle can act independently, but they can and will interact together to transform the way both freeway and arterial operations occur. The INFLO bundle is viewed as being deployed incrementally with implementation in the near-term (today), mid-term (as more vehicles are equipped with latest technology), and, ultimately, long term (100% vehicle penetration).

These applications can be evolved from their current state by leveraging Connected Vehicle technology to offer significant transformative impacts while minimizing a number of the risks and delays inherent in developing entirely new concepts. This philosophy of identifying applications that can be deployed in the near-term is in keeping with the USDOT’s goals of quickly moving these applications from the research stage to adoption in the field.