DOT LogoC:\Documents and Settings\newtondia\My Documents\Unzipped\SAIC_Logo_Collection\SAIC_Logo_Collection\JPG\SAIC_logo_RGB-sm.jpgDescription: 3 inch color Bleed.pngnu_logo.gif
Q-WARN: Current Practice Overview
28
•Typical queuing conditions:
•Exit ramp spillback
•Construction zone queues
•Fog (visibility)
•Border crossings
•
•Solutions utilized:
•Infrastructure-based detection paired with static signs, variable speed signs/VMS, or flashers
•
•Limitations:
•Static, infrastructure-based solutions limit range and scope of queue detection