DOT LogoC:\Documents and Settings\newtondia\My Documents\Unzipped\SAIC_Logo_Collection\SAIC_Logo_Collection\JPG\SAIC_logo_RGB-sm.jpgDescription: 3 inch color Bleed.pngnu_logo.gif
CACC User Needs (2)
102
User Type
User Need
Description
5
CACC Application/System
Need to develop a CACC algorithms and  application.
Need to develop an application which collects data needed for CACC and performs the necessary  calculations for latitudinal and longitudinal controls, gap reduction, shockwave speed reduction, improved action times and system alerting.  
6
CACC Application/System
Need to develop a CACC performance measurement system
There is a need to measure the performance of the system and algorithms both to understand performance, but to be able to tweak algorithms as required.
7
Other DMAs
The CACC system/application needs to be able to be interfaced with other DMA applications.
There are other applications, including SPD-HARM and CACC, among others, that would benefit from direct coordination with the Q-WARN Application. 
8
DCM Environments
Needs to be able to be interfaced with the DCM  Environments.
The CACC system/application needs to be able to be interfaced with the Freeway and Arterial DCM  Environments