Pre-Model Deployment and Testing Stage
§2. Preparation & Installation of Required Components
§During this phase, the Test Conductor shall:
□Acquire or develop all of the hardware and software components needed for the Model Deployment,
□Install the components in the appropriate locations
□Recruit all drivers participating in the Safety Pilot
§USDOT will provide to the Test Conductor as GFE:
□Sixty integrated light vehicles (eight of these will be provided in time for use in the Pre-Model Deployment Tests)
□Two-to-Three integrated heavy vehicles for use in the Model Deployment (one, if available, for use in the Pre-Model Deployment Tests)
□Three retrofit device transit vehicles for use in Model Deployment