§2.
Preparation & Installation of Required Components
§During this phase, the Test
Conductor shall:
□Acquire
or develop all of the hardware and software components needed
for the Model Deployment,
□Install
the components in the appropriate locations
□Recruit
all drivers participating in the Safety Pilot
§USDOT will provide to the
Test Conductor as GFE:
□Sixty
integrated light vehicles (eight of these will be provided in time for use in
the Pre-Model Deployment Tests)
□Two-to-Three
integrated heavy vehicles for use in the Model Deployment
(one, if available, for use in the Pre-Model Deployment Tests)
□Three
retrofit device transit vehicles for use in Model Deployment