§2.
Preparation & Installation of Required Components
§For the Model Deployment,
the Test Conductor shall (continued):
□Arrange
with one or more transit agencies to provide at least 10 transit vehicles
to be equipped with HIA devices
□Equip
each integrated light and heavy duty vehicle and each retrofitted heavy and
transit vehicle with a data acquisition system
□Provide
125 light vehicles: 110 with HIA devices, 15 with aftermarket safety
devices; CAMP will provide 8 integrated vehicles
□Arrange
with at least one local traffic agency to upgrade or install 12 traffic signal controllers capable
of transmitting SPaT data to an RSE,
□Install 2
RSEs at each of 3 Curve Over-Speed locations; and 1 RSE at 5 Actuated
Traffic Signal Controller
□