‹#›
U.S. Department of Transportation
Triscallion_Black
Pre-Model Deployment and Testing Stage
§2. Preparation & Installation of Required Components
§For the Model Deployment, the Test Conductor shall (continued):
□Arrange with one or more transit agencies to provide at least 10 transit vehicles to be equipped with HIA devices
□Equip each integrated light and heavy duty vehicle and each retrofitted heavy and transit vehicle with a data acquisition system
□Provide 125 light vehicles: 110 with HIA devices, 15 with aftermarket safety devices; CAMP will provide 8 integrated vehicles
□Arrange with at least one local traffic agency to upgrade or install  12 traffic signal controllers capable of transmitting SPaT data to an RSE,
□Install 2 RSEs at each of 3 Curve Over-Speed locations; and 1 RSE at 5 Actuated Traffic Signal Controller 
□