‹#›
U.S. Department of Transportation
Triscallion_Black
Post-Model Deployment Stage
§At the completion of the Model Deployment, the Test Conductor shall:
§Decommission (remove) all equipment installed in all light vehicles volunteered for the Model Deployment and in all heavy and transit vehicles provided by local organizations (public or private) for use in the Model Deployment
§Dispose of the equipment used in the Model Deployment as directed by the USDOT
□