|
|
|
Objective: The
benefit-cost analysis will evaluate the environmental benefits for AERIS
applications on a nation-wide basis; this is a preliminary analysis,
as better information becomes available, the analysis will be revisited
|
|
Output: Results
will be used as part of prioritization of applications, comparing
applications on a standard baseline to support a programmatic “go” or “no-go”
decisions on individual applications and/or TCs
|
|
Follow-Up: Detailed
modeling and simulation on the applications and TCs will lead to revised
benefit and cost estimates that will be introduced to the Benefit-Cost
Analysis model to improve analyses
|
|
|