•Two Levels
–First level
•Devices log IP data
messages
•Includes VADs and ASD w/o
DAS
–Second Level
•Full Data Acquisition
Systems (DAS)
•Collect device and vehicle
data
•Collect video data
•Collection Schedule
–Integrated light vehicles
monthly
–VADs and ASDs with and
without DAS every two months
–First 6 months data support
preliminary analysis.
–
•