Task 5 Overview
•
Kickoff in May 2012
•
Prototype Design, Build and Install:
–
System Requirements
–
Site Selection
–
Architecture
–
Component Level Design
–
Prototype Development and Test
–
Build and Install Prototype
–
Prototype Field Testing
–
Documentation
•
12