DOT Logo
Task 5 Overview
•Kickoff in May 2012
•Prototype Design, Build and Install:
–System Requirements
–Site Selection
–Architecture
–Component Level Design
–Prototype Development and Test
–Build and Install Prototype
–Prototype Field Testing
–Documentation
•
12