U.S. Department of Transportation
Current Phase
§
Contract Awarded to:
□
Look at existing equipment/research
□
Develop a concept of operations
□
Prototype development/testing
□
Facilitate stakeholder outreach
•
AS I MENTIONED SAIC HAS BEEN TASKED WITH WORK IN THESE FOUR MAIN AREAS:
•
FIRST PERFORMING A LITERATURE REVIEW, USER NEEDS ASSESSMENT, AND DEVELOPING THE APPLICATION PRIORITIZATION
•
SECONDLY, DEVELOPING A CONCEPT OF OPERATIONS
•
DEVELOP AND AND TEST THE PROTOTYPE
•
AND THROUGHOUT THE ENTIRE PROJECT FACILITATE STAKEHOLDER OUTREACH TO ENSURE A TRANSPARENT PROCESS