U.S. Department of Transportation
Triscallion_Black
Current Phase
§Contract Awarded to:
□Look at existing equipment/research
□Develop a concept of operations
□Prototype development/testing
□Facilitate stakeholder outreach
•AS I MENTIONED SAIC HAS BEEN TASKED WITH WORK IN THESE FOUR MAIN AREAS:
•FIRST PERFORMING A LITERATURE REVIEW, USER NEEDS ASSESSMENT, AND DEVELOPING THE APPLICATION PRIORITIZATION

•SECONDLY, DEVELOPING A CONCEPT OF OPERATIONS

•DEVELOP AND AND TEST THE PROTOTYPE

•AND THROUGHOUT THE ENTIRE PROJECT FACILITATE STAKEHOLDER OUTREACH TO ENSURE A TRANSPARENT PROCESS