U.S. Department of Transportation
SRI Prototype
§
System Requirements
§
Architecture
§
Component Level Design
§
Prototype Development and Test
§
Build and Install Prototype
§
Prototype Field Testing
§
Documentation
•
UPON COMPLETION OF THE CONOPS THE NEXT EFFORT IS THE SRI PROTOTYPE, IF YOU LOOK AT THE ROADMAP,
•
THE FIRST PORTION OF THE WORK, UP THROUGH DEVELOPMENT AND TESTING, IS SCHEDULED FOR NEXT YEAR
•
THE INSTALLATION AND FIELD TESTING IS SCHEDULED TO TAKE PLACE IN 2013 AND INTO 2014.