‹#›
U.S. Department of Transportation
Triscallion_Black
Near-Term (1992-1996)
Mid-Term (1997-2001)
Long-Term (2002-2011)
Transportation Management
Local area traffic monitoring and control for 15 metro area corridors
Area-wide, real-time, adaptive traffic and transit fleet control for corridors in 50 metro areas and 25 inter-city corridors
Area-wide, full-featured systems to manage intermodal surface transportation nationwide in large urban areas and major rural corridors
ITS Deployment Then and Now: Freeway and Arterial Management
§For collection of travel times:
□2464 arterial miles under surveillance from roadside infrastructure
□1730 miles under surveillance from vehicle probes
□50% of intersections in 75 metro are under electronic surveillance
http://www.fhwa.dot.gov/everydaycounts/images/gallery/adsc/2.jpg