‹#›
10/20/2011
CAMP - VSC3 Consortium
System Performance Testing - Overview
Purpose
•To assess system performance and reliability in diverse geographic regions of the country under real-world conditions in both rural and urban locations
•Performance testing is a critical activity to support the 2013 V2V NCAP or regulatory decision
Approach
•Performance testing will be performed after each of the DACs and executed at close proximity to the DAC sites
•Will utilize eight (8)  similarly-equipped OEM engineering template vehicles
•This activity is coordinated with the DAC Schedule