Core System Timeline
FCC allocates
5.9 GHz spectrum
for DSRC
VII Architecture
developed based
on Day 1 Use Cases
Prototypes for V2V (safety applications)
and V2I (public applications) developed
based on DSRC 5.9 GHz and tested in
a POC test bed
New assumptions, new
initiatives, new timelines
SE Program initiated
to re-baseline
Stakeholder workshops
to solicit user needs
Re-baselined Core System
Concept of Operations, Requirements,
& Architecture completed
System Requirements & Architecture
Oct (draft)
Jan (RevA)
Apr (RevB/C)
May (workshop)
June 2011 (Workshop)
Sep (2nd Workshop)