Research Archive

System Requirement Specification for the I-270 Integrated Corridor Management System (ICMS) in Montgomery County, Maryland

File NTL #14423 HTML | PDF (3.4 MB)
Useful to Transportation infrastructure engineers, managers and operators interested to optimize their multimodal transportation networks through ICM.
Abstract This document presents a revised System Requirements Specification (SyRS) for an Integrated Corridor Management (ICM) System along the Interstate-270 Corridor in Montgomery County, Maryland. This corridor is one of the eight ICM Pioneer Sites. It provides a description of the planned ICM System and delineated high-level and detailed requirements for the system. The I-270 ICMS will focus on traveler and operations management decision support by emphasizing corridor transportation systems management, traveler information dissemination, and systems evaluation by leveraging, and improving upon, current data collection, fusion capabilities, and corridor transportation system integration.
How to Use Transportation professionals in the field involved in, or approaching, the requirements phase of the ICM lifecycle can use this document to help them define their System Requirement Specification (SRS) for their ICMS.
Date of Publication 3/08
Publication Agency USDOT
POC Brian Cronin
RITA
202-366-8841
brian.cronin@dot.gov

Dale Thompson
FHWA
202-493-3420
dale.thompson@dot.gov

Steven Mortensen
FTA
202-493-0459
steven.mortensen@dot.gov
Number of Pages 141

1200 New Jersey Avenue, SE • Washington, DC 20590 • 800.853.1351 • E-mail OST-R

Accessibility | Disclaimer | Fast Lane | FedStats | Freedom of Information Act | No FEAR Act | OIG Hotline | Privacy Policy | USA.gov | White House


OST-R's privacy policies and procedures do not necessarily apply to external web sites. We suggest contacting these sites directly for information on their data collection and distribution policies.