Research Archive

US-75 ICM System Requirements, Dallas Integrated Corridor Management (ICM) Demonstration Project

File NTL # PDF
Useful to Transportation infrastructure engineers, managers and operators interested to optimize their multimodal transportation networks through ICM.
Abstract This document is intended as a listing and discussion of the Requirements for the US-75 Integrated Corridor Management System (ICMS) Demonstration Project in Dallas. This document describes what the system is to do (the functional requirements), how well it is to perform (the performance requirements), and under what conditions (non-functional and performance requirements). This document does not define how the system is to be built; that is the providence of the design document.This document sets the technical scope of the system to be built for the Demonstration Project.
How to Use Transportation infrastructure engineers, managers and operators interested to optimize their multimodal transportation networks through ICM.
Date of Publication 12/12
Publication Agency USDOT
POC "Steven Mortensen FTA 202-493-0459 steven.mortensen@dot.gov "
Number of Pages 125