System Acceptance Test Plan: Dallas Integrated Corridor Management (ICM) Demonstration Project

File NTL # PDF
Useful to Transportation professionals interested to learn more about how to develop and implement a system acceptance test plan for ICM.
Abstract This document is intended as a listing of a set of test procedures to verify the Requirements for the US-75 ICM Demonstration Project in Dallas. This document includes the overall plan for acceptance testing of the ICM system. The specific scripts to conduct the acceptance test are attached as an appendix. The scripts are based on the requirements document, and the design documents.
How to Use Transportation professionals in the field seeking to implement or implementing ICM can use this document as a guide to structure their own system acceptance test plan for ICM.
Date of Publication 2/13
Publication Agency USDOT
POC Steven Mortensen FTA 202-493-0459 steven.mortensen@dot.gov
Number of Pages 234

1200 New Jersey Avenue, SE • Washington, DC 20590 • 800.853.1351 • E-mail OST-R

Accessibility | Disclaimer | Fast Lane | FedStats | Freedom of Information Act | No FEAR Act | OIG Hotline | Privacy Policy | USA.gov | White House


OST-R's privacy policies and procedures do not necessarily apply to external web sites. We suggest contacting these sites directly for information on their data collection and distribution policies.